What happens if you demolish a load-bearing wall: the consequences of improper repairs


Changing the layout of the room involves demolishing the floors. In a private house, the owner can demolish any wall without asking permission from neighbors or the relevant authorities. Dismantling walls in apartment buildings must be carried out with the consent of certain authorities.

A significant percentage of residents of high-rise buildings are trying to change the layout of their apartments to expand their functionality. The main reason is the inconvenience and the configuration of the premises that has lost its relevance, because most of them were built during the Soviet Union.

Almost everyone tried to remodel their apartment without taking into account some architectural aspects. In this regard, many emergency situations were created that could cause irreparable harm to human health and the integrity of objects. Because of these fears, a government decree appeared, which obligated BTI employees to inspect residential premises in apartment buildings for unauthorized dismantling of walls and partitions.

If the walls are demolished without supporting documents, then in the future there will be:

  • Difficulty in re-issuing documents;
  • During privatization;
  • Refusal to issue a mortgage.

If the repairs carried out did not create an emergency situation, the owner of the apartment faces only a fine followed by obtaining a permit issued retroactively. In the event of an emergency, the owner pays a fine and returns the premises to its original condition.

The main reason for changing the layout is the inconvenience and configuration of the premises that has lost its relevance.

Dismantling a wall in an apartment without an accompanying document can be done if it does not bear the main load and then, in most cases, this document is necessary. This moment is determined by the parameters of the partition. For a panel house, the thickness of the main floor is 12–20 centimeters, the partition – 8-10 centimeters. In brick houses, the thickness of the partitions ranges from 8 to 12 centimeters, the main one - from 38 to 64 centimeters. Dismantling a wall in an apartment without an accompanying document can be done if it does not bear the main load and then, in most cases, this document is necessary.

In a panel house

When demolishing walls in a panel house, in order to avoid the collapse of the entire reinforced concrete structure, beams are installed for support. First, holes are made. Then the concrete layer is cleared. Metal rods are cut with a grinder. Dismantling of concrete walls is carried out in stages, in small intervals. When demolishing walls in a panel house, in order to avoid the collapse of the entire reinforced concrete structure, beams are installed for support.

In Khrushchev

During the reign of Nikita Khrushchev, apartments were built according to a specific project. They had three vertical walls and several horizontal partitions. Demolition of the wall between the kitchen and the room in Khrushchev is the most common type of dismantling. This is done to increase the usable area. This move was permitted, but to be sure, it is advisable to measure the thickness of the wall before demolition.

Demolition of the wall between the kitchen and the room in Khrushchev is the most common type of dismantling.

Which walls can and cannot be dismantled?

Most often, reconstruction occurs in connection with an expansion of the area or a change in its functional value. A large percentage of alterations occur on the ground floors, in which it is planned to open a store or beauty salon in the future, and so on. Here the wall may be part of the foundation, therefore a full inspection of the structure by specialists is required, followed by permission. A large percentage of alterations occur on the ground floors, in which it is planned to open a store or beauty salon in the future, and so on.

Window and other openings. It is important to determine the nature of the surface, based on which the further appearance of the building’s façade will be designed. Reducing light openings in high-rise buildings is quite problematic. You can increase them.

Dismantling a wall in a panel house is a more affordable option, but only for external surfaces. The reason is that during the construction of a building, the entire load is “taken” by solid or prefabricated modules made of iron and concrete. However, the main wall can still be dismantled. In its place, supports are installed to strengthen the structure. The supports are subsequently decorated to match the interior of the room.

Dismantling a wall in a panel house is a more affordable option, but only for external surfaces.

Getting permissions

Where does the demolition of a load-bearing wall in a panel house begin? With specialist consultation. In different cities, different structures deal with such issues, so the most reasonable thing is to start by contacting the management company servicing your home. If it does not have a specialist of a similar profile on staff, you will at least be sent to an organization that does have such an engineer. As a rule, this is the architectural department of the local administration.

Important! This is a very important point, because it will be necessary to make strength calculations taking into account the fact that the load will no longer fall on one of the walls of your house. It is also possible that you will have to radically change the power supply circuit or other communications. A specialist will give a technical opinion on the possibility of demolishing the wall you want to remove.

What's next?

Once you have the floor plan and technical report in your hands, you can safely contact the Housing Inspectorate. She must approve the demolition - not the redevelopment project, but the very possibility of removing this or that structure.

There are usually no problems with partitions, but permanent walls are rarely allowed to be removed. Don't be self-willed. Even if the Housing Inspectorate does not come to you right after the renovation, it is quite possible that you will someday want to sell or exchange your home. If the redevelopment has not been agreed upon, very serious difficulties may arise with this. After permission in principle for demolition has been received, you need to order the project from a licensed design organization and coordinate it with all authorities, and then order a new floor plan from the BTI - it will be different.

Important! Uncoordinated redevelopment sometimes leads to court decisions that are unpleasant for the owner - the apartment can even be confiscated.

Preparatory work before demolition of walls

Preliminary work is carried out before demolition. All things and furniture are removed. The general heating system, water supply, electricity, gas, TV antenna and radio point should be turned off.

You also need to prepare bags for garbage disposal. If the volume of waste is large, then you should take care of the dumping site in advance. It is necessary to know the regulations for carrying out repair work in high-rise buildings. On weekdays this is from 9 am to 7 pm. On weekends, silence should be maintained, and you should not use devices or units that create vibration. If the volume of waste is large, then you should take care of the dumping site in advance.

Neighbors and renovation: how to deal with illegal redevelopment

When remodeling an apartment “to suit themselves,” owners often break the law: they break walls, install heavy structures, and move radiators onto the loggia. At the same time, the owners forget that their housing is part of the house. And for violating norms and standards, you can lose your property.

Neighbors and renovation: how to deal with illegal redevelopment

When remodeling an apartment, many do not even think about the safety of other residents and the legality of their actions. In pursuit of their own convenience, they forget that demolishing a wall can lead to a crack in the house, moving a bathroom can lead to flooding of neighbors, blocking the hood can lead to problems with ventilation. An incorrectly installed heated floor will begin to “steal” heat and neighboring apartments will be very cold in winter. How to deal with violators?

What is illegal redevelopment

Contrary to popular belief, illegal redevelopment is not only about moving a wall and combining a balcony with a living space. Few people know that even expanding the kitchen at the expense of the next room, reducing the corridor to enlarge the bathroom must be reported to the Moscow Housing Inspectorate. In general, everything that is associated with a change in usable area (up or down) is considered redevelopment.

In the technical passport, after approval, the replacement of equipment and utility networks must be recorded. You cannot simply change a gas stove to an electric one at will or move the sewer system from one corner of the room to another.

Without approval, you can install air conditioners and make cosmetic repairs. As for engineering equipment, it must be similar in technical characteristics to the previous one.

It is not necessary to coordinate the glazing of balconies and loggias, or openings in non-load-bearing structures. But upon completion of the repair work, you need to obtain a corresponding certificate.

  • demolish load-bearing walls;
  • make partitions from heavy materials;
  • close, reduce or increase the ventilation opening;
  • connect heated floors to communal heating systems;
  • move radiators;
  • place the heating on the balcony, loggia;
  • combine the kitchen, in which the gas stove is installed, with the living space;
  • do redevelopment and arrangement of the attic, roof and technical floor;
  • do redevelopment in apartments that are located in dilapidated buildings, etc.

How to dismantle walls in an apartment

Dismantling is carried out in only two ways. The ceiling can be completely destroyed or partially dismantled. The first method is optimal for partitions made of stone, the second - for walls made of plasterboard and sometimes brick.

The ceiling can be completely destroyed or partially dismantled.

Carrier

If a load-bearing wall is dismantled, a new project diagram must be drawn up, which must be agreed upon and obtained permission from the relevant authorities. Here it is better to involve a specialist who will make the correct calculations with the distribution of the existing load on the wall and distribute the subsequent one.

Demolition of a load-bearing wall in an apartment requires a number of preliminary actions. Before starting work, you must have a plan from the BTI, a conclusion for the demolition of the wall, and a permit from the housing inspection. A load-bearing wall cannot be destroyed immediately. It is being taken apart piece by piece.

A load-bearing wall cannot be destroyed immediately. It is being taken apart piece by piece.

Non-load-bearing

It is also impossible to demolish a non-load-bearing wall without the approval of the BTI; a number of similar difficulties may arise with the subsequent re-registration of the apartment. However, the labor costs here are much less. For example, demolition does not require erection of support beams. But again, it all depends on the area of ​​the wall. Otherwise, the demolition technique must correspond to the material from which the ceiling is made. During demolition, erection of support beams is not required.

Brick

Here, as in the main actions, you can immediately completely destroy the wall using a sledgehammer. Or you can, using a crowbar, a pickaxe and a sledgehammer, disassemble the wall brick by brick, which can later be used in the construction of a new facility. The second method is relevant if the bricks were laid on lime or a thin cement layer.

You can use a crowbar, a pickaxe and a sledgehammer to dismantle the wall brick by brick.

Concrete

To protect the flooring from concrete blocks, it should be covered with boards. Marks are made on the wall to determine the phased dismantling of the floor. As a rule, markings are placed in the form of squares.

A series of holes are drilled on each line at a uniform distance from each other. Next, a square is cut out using a circular saw. Using a percussion tool, the square is knocked out. Taking into account cement dust, it is advisable to carry out work in special clothing. Taking into account cement dust, it is advisable to carry out work in special clothing.

What redevelopment can be done in a mortgaged apartment?

The same as in an apartment without encumbrances in the form of a mortgage.

Banks often accommodate clients who want to remodel their living space. The contract may not prohibit repair work. Therefore, redevelopment in a mortgaged apartment is not expressly prohibited.

Another thing is that the work must be coordinated with the bank and insurance company. Without their permission, redevelopment cannot be registered in Rosreestr, and it will be considered illegal. The lender will approve the simplest alterations according to a sketch without any problems, and the same for a project. And if the plans involve load-bearing walls, they may refuse. There are known cases when the bank did not approve the dismantling of the heated towel rail when the partition between the bathroom and the toilet was demolished.

Removing the wall between the kitchen and the room

Demolition of the wall between the kitchen and the room cannot be carried out by cutting out the entire area. In fact, this can be done, but the question will arise about the weight of the entire slab, as well as the method of pushing it out.

The best option is to break the wall into small pieces that can be easily picked up and thrown away. The wall can be disassembled completely or partially. The demolition between these two rooms is more due to the expansion of space. You can leave small sections of the partition to zone the room into a living and kitchen area. This is true for studio apartments. You can leave small sections of the partition to zone the room into a living and kitchen area.

Disassemble the main or non-load-bearing wall in an apartment building without approval and obtaining a conclusion. You also need to think about your neighbors, whom it is advisable to warn in advance about the nature of the work, because many have children who need a nap during the day.

What are we removing?

No normal resident would think of demolishing the outer wall or the one that separates the apartment from the common corridor. But with those that are inside the apartment, there are different nuances, and confusion arises from time to time. So the first thing you need to do, if you are interested in what kind of load-bearing or non-load-bearing walls can be demolished in a panel house, is to contact the technical inventory bureau. There you can get a floor plan with everything listed:

  • the main walls are boldly outlined;
  • the partitions are indicated by thin lines.

Important! The BTI service is paid, but since you may need such a plan more than once when you receive approvals, you will have to get it.

When permission is needed

Many apartment owners believe that they can do whatever they want with their property. This is only partly true: since the apartment is located in a multi-story building, it is also part of the entire building.

When building a house, engineers take into account a huge number of nuances, thanks to which the building remains standing and does not collapse. This includes the load-bearing capacity of the walls, the depth of the foundation, the calculation of utilities, ventilation, heating and other important points.

If these details are not taken into account during repair work, this can lead to unpredictable consequences. For example, an illegal extension of a balcony on the upper floors can lead to its collapse.

Deepening the basement to increase the height (for example, if it is planned to build a store there) can provoke destruction of the foundation, and demolishing a wall can cause destruction and collapse. Therefore, serious major renovations require approval from the Housing Commission and a full check: whether subsequent changes will affect neighboring apartments or the entire building.

Important to remember:

it is impossible to hide a serious redevelopment: any ill-considered changes cause problems in the integrity of the building, which can be discovered at any time by neighbors.

This is a rather lengthy and, in some cases, expensive process that many decide to bypass.

A person who destroys a load-bearing wall in his apartment will be prosecuted...

What happens if you tear down a load-bearing wall?

The Verkhovna Rada has amended the legislation, significantly tightening the punishment for damage to housing and communal services

It so happened historically that the architectural tastes of citizens rarely coincide with the ideas of those who create residential building projects. Especially when it comes to standard construction of the second half of the last century. The apartments in most of these buildings are cramped and have an inconvenient layout. And people often make major renovations to their homes with partial or even complete redevelopment of the interior.

Unfortunately, reconstructions are usually carried out not only without agreement with architects and utility services, but even without agreement with neighbors. As a result, self-taught builders manage to block air ducts, disrupt heating and water supply systems, demolish load-bearing walls, and add stairwells, strollers and other common areas to their apartments. Such vigorous activity sometimes leads to serious damage to the structures of residential buildings and even to their collapse.

Moreover, it is not easy to deal with would-be architects, since the most severe punishment is a fine. However, it seems that violators will soon be able to be put behind bars.

If damage is caused on an especially large scale, the death of a person or other grave consequences, the offender faces imprisonment for up to 12 years.

The Verkhovna Rada has made changes to the legislation, significantly tightening liability for damage to housing and communal services. According to the calculations of deputies, legislative changes will affect those who unauthorizedly remodel apartments, which causes premature destruction of building structures, damages ventilation systems and gas flues in residential apartment buildings, steals fire hydrants, breaks electrical switchboards and elevator equipment, stores explosive substances at home, gas cylinders, steals manhole covers, causing people to fall into sewer wells.

An article has been added to the Criminal Code of Ukraine according to which the intentional destruction or damage of housing stock, improvement facilities, heat supply, water supply and drainage, as well as their networks or components (manhole covers, gratings), if the losses exceeded 5,100 hryvnia, is punishable by a fine of 100 to 250 non-taxable minimum income of citizens (1700-4250 hryvnia) or correctional labor for up to two years. Restriction or imprisonment for up to three years is also possible.

The same actions, committed repeatedly or in a socially dangerous manner, are punishable by imprisonment for a term of three to eight years. If damage is caused on an especially large scale (17 thousand hryvnia), the death of a person or other grave consequences, the offender faces imprisonment for a term of five to twelve years.

The greatest public outcry was caused by the provision on criminal liability for illegal redevelopment. It’s no secret that in most cases, owners make major renovations in their apartments without the appropriate plans and permits. People complain about the length and cost of obtaining documents for redevelopment, as well as about the bureaucracy in this procedure. Indeed, this is a complex process that requires not only time and nerves, but also a lot of money. Although a little over a year ago the state somewhat simplified the procedure for registering redevelopment.

Let us remind you that, according to the government decree “Some issues of granting permits for preparatory and construction work,” the procedure for obtaining permits for the construction, repair and redevelopment of houses and apartments has changed significantly.

In particular, it is now possible to redevelop apartments in residential buildings and rooms in dormitories, as well as public facilities, without permission from the State Architectural and Construction Inspectorate.

But only with the preservation of load-bearing structures, without exceeding the permissible loads on floors, walls and foundations and subject to compliance with architectural and planning requirements, state building codes and local development rules.

When permission is not needed

But don’t think that any repair requires contacting the Housing Inspectorate. A large number of works can be carried out completely calmly, without fear of fines. These include:

  1. Any cosmetic repairs: painting or wallpapering, replacing floors, ceilings, some external elements, if they do not affect the functionality of the building, for example, installing a new drain or installing an air conditioner, television dish, protective nets.
  2. Rearrangement or removal of built-in furniture: cabinets and mezzanines, if they are not a separate room and are not specified in the technical passport. That is, it is impossible to remove the wall between the pantry and the room - it may turn out to be load-bearing.
  3. Rearranging or replacing gas and water heating elements, if it is not necessary to lay additional networks, you can also rearrange the electric stove.
  4. Replacing doors and windows, replacing the material of balconies and loggias: you can put a plastic window in place of an old one, but you can’t “cut through” a larger one. The same applies to glazing: it is discussed below.
  5. Replacement of engineering equipment with something similar in all respects without rearranging it.

In other words, any work that does not affect the technical parameters of the apartment does not need to be legalized. It is important to remember that there are some types of repair work that do not require approval from the Housing Inspectorate, but they must be notified upon completion.

Methods for determining load-bearing walls

So, the first, simplest and most accurate is to find the structural plan of the house, which is stored in the capital construction department, which is located in the city Executive Committee, also known as the Executive Committee. There is also a technical passport of the apartment, which all apartment owners have, but you can understand it only if you know how to read construction drawings.

If you were unable to get a plan, then you can try to determine the load-bearing wall by its thickness and location.

Wall thickness

In a brick house, all walls thicker than 38 cm are load-bearing. The thickness of the walls in such houses is determined by the number of bricks laid out in a row. One brick is 12 cm, which means simple arithmetic works: 250 mm is a wall of two bricks + a 10 mm seam between them. 380 mm is a wall of three bricks + 2 joints of 10 mm each. 510 mm is a wall of four bricks + 3 joints of 10 mm each. 640 mm is a wall of five bricks + 4 joints of 10 mm each. and so on. Interior partitions are built from brick or concrete blocks and range in thickness from 12 to 18 cm. The walls between apartments are slightly thicker - 25cm.

All walls thicker than 14 cm are load-bearing in the panel type. Unfortunately, in these types of houses it is very difficult to realize all your ideas, since most of the walls in such houses are load-bearing. Partitions in panel houses are much thinner than load-bearing walls - only 8-10 cm. There is also a nuance - the thickness of load-bearing walls in panel houses can be 12 cm, it depends on the series of the house. So what should we do? Should such a wall be considered a thickened partition or a load-bearing wall? The final answer will only be given to you by an engineer in the relevant organization that issues an opinion on the terms of reference for your project.

In monolithic houses there is a load-bearing wall thicker than 20 cm. The surest way for such houses is to take a floor plan from the developer. Since there is now a huge variety of design solutions, in such houses it can be very difficult to determine the load-bearing wall simply by its thickness. For example, in a monolithic frame house, there may be no load-bearing walls at all. And there are cases when a simple partition is thicker than 20cm. So only an architectural plan can clarify this issue.

Notification without consent

In some cases, you do not need to receive it, but after completing the repairs, you must notify the Housing Inspectorate and make changes to the documents.

If this is not done, then when selling an apartment, exchanging or inheriting it, difficulties may arise due to the difference between the plan of the living space and the actual condition. Such cases include:

  1. Rearrangement in the kitchen, bathroom and toilet without changing the dimensions of the premises.
  2. “Cutting through” or sealing passages in walls between rooms.
  3. Glazing of balconies and loggias.
  4. Analysis of non-load-bearing walls.
  5. Construction of additional walls, if this does not increase the load on the floor, the partitions should be fairly light.
  6. Changing the shape of vestibules or eliminating them completely.

It is important to remember that demolishing walls or installing doorways in them can only be done between rooms - neighboring apartments cannot be combined in this way; this requires prior approval.

Any change that does not pose a potential threat to the entire house and neighboring apartments, but changes the overall plan, must be reflected in the BTI documents. If the repair does not affect the layout in any way and eliminates any threat, it may not be approved at all.

Take note:

if it is planned to carry out global repairs, including the demolition of walls, installation of house communications and other serious work, the Housing Committee must be notified about this in advance and all changes must be agreed upon, taking into account all the nuances.

Watch the following video to see how the redevelopment may take place in the near future:

Dear readers! Our articles talk about typical ways to resolve legal issues, but each case is unique. If you want to find out how to solve your particular problem, please use the online consultant form on the right or call:

Sooner or later, each of us gets tired of the usual environment of a house or apartment and a natural desire comes to change it somehow by remodeling the living space. This event involves partial modification of the walls or their complete demolition. In this lesson we will tell you how to break a wall correctly

depending on the material from which it is made and what tools are needed for this.

Having chosen, in your opinion, the ideal option for redevelopment, you must obtain permission to carry it out from the relevant government authorities. Without their written consent, redevelopment will be considered illegal, which in the future may complicate the sale or re-registration of housing.

Remember that changes to the walls during redevelopment can cause them to shift, which can lead to disruption of the stability of the house and other unpredictable consequences. In any case, before breaking a concrete or brick wall, you should consult with construction professionals.

What is prohibited

Anything that leads to a deterioration in people’s living conditions is prohibited. Work that leads to the destruction of the building will also not be allowed. Access to public communications cannot be restricted.

For example, in Moscow, the prohibitions are described in paragraph 10 of Moscow Government Decree No. 1335-PP of August 19, 2021 (replacing PP No. 508). For regions, local government regulations apply.

Let's look at what you absolutely cannot do in an apartment.

Demolish load-bearing walls

Load-bearing walls are the supporting structures that support an apartment building. Impact on load-bearing walls must be extremely careful.

It is forbidden:

  • Completely demolish load-bearing walls to suit the layout.
  • Hollow out openings in load-bearing walls without the permission of the author of the house.
  • Leave openings without reinforcement with metal structures.

If you demolish a load-bearing wall, part of the house may collapse. Therefore, 100% dismantling of supporting structures is unacceptable!

Move the kitchen or bathroom to the living room

Also prohibited.

This is reported by paragraph 24 of the Decree of the Government of the Russian Federation No. 47 of January 28, 2006. It is unacceptable to place the kitchen and bathroom above the living rooms of neighbors.

A kitchen with a gas stove cannot be moved into the living room. Even if you have an electric stove, transfer is not possible in all cases.

A bathroom is a toilet and a bathtub. There are “wet” zones, that is, water supply systems. If you move the bathroom into the room, it will end up under the neighbors' living room. And if a pipe breaks, water will flood the residents from below.

On a note! There is an option to move the bathroom or kitchen to the living room. To do this, your apartment must be on the 1st floor of an apartment building. That is, there are no neighbors below, therefore, the risks of flooding them are reduced to zero.

Expand the room with a balcony

You cannot combine a loggia or balcony with a room where people live. And there are a number of explanations for this:

  1. Firstly, the temperature in the room will drop - due to the fact that the balcony is considered a “cold zone”.
  2. Secondly, it is prohibited to install heating radiators on the balcony.
  3. Thirdly, this is a violation and you will be forced to redo the repair.

The best option is to remove the window sill block and build something like a transparent glass partition. Or, as they call it, a “French” window.

Combine the room and kitchen with a gas stove

Absolutely forbidden!

Gas equipment is a high-risk system. The kitchen must be isolated. To do this, it will be equipped with a swing door. If you want to make an opening in the wall between the room and the kitchen, you will not be given permission to do so. But if there is a swing door in place of the opening, it can be agreed upon.

Seize the vestibule, attic and other property of the house

Common property is not the property of individual residents of the entrance. It is unacceptable to “seize” such property.

If you add a vestibule, part of the staircase, attic or basement to the apartment, you will be forced to return everything as it was.

Other jobs

The law also prohibits:

  • trim ventilation ducts and create niches in them;
  • clean thresholds in the bathroom and toilet;
  • connect heated floors to the heating battery;
  • block access to meters, water supply risers, ventilation and other engineering systems;
  • seal the only window in the kitchen;
  • dismantle batteries in living rooms.

It is still impossible to remodel an apartment if the house is in disrepair. Only reconstruction is allowed there, but in general such buildings are subject to demolition.

Complaint about illegal redevelopment of neighbors' apartment

What is the difference between redevelopment, redevelopment or reconstruction? Detailed analysis

Choosing the right tool for the job

The main reasons for deciding to demolish or modify walls is the need to combine two adjacent rooms (for example, a bath with a toilet or a kitchen with a balcony), as well as the creation of a through opening. Professionals categorically do not recommend touching load-bearing walls! This has consequences for your safety.

Load-bearing walls are somewhat thicker than usual, however, to accurately determine them, you must first look at the design documentation or entrust the work of demolishing the walls

specialists.

If you decide to tear down the wall yourself, then after receiving permission for redevelopment, all you have to do is choose the method of dismantling. Despite the material from which the wall is built, in practice, 3 main methods are most often used for demolishing a wall partition:

  1. using a jackhammer;
  2. using a grinder;
  3. using a powerful hammer drill or impact drill.

The choice of a specific tool will directly depend on the complexity of the work performed and the inconveniences that arise. Since you won’t be able to break down a wall without construction dust and debris, it’s a good idea to wear special clothing and protective equipment (goggles, hard hat, respirator).

Tools

Before tearing down the partition between the kitchen and the room, you should prepare the tools. They can be:

  • axe;
  • mount;
  • putty knife;
  • chisel;
  • hacksaw;
  • pliers;
  • hammer;
  • screwdrivers.

All this will be needed only if manual dismantling is provided. But you can’t take a concrete wall with such devices. To dismantle a partition made of durable materials, you can use:

  • grinder;
  • hammer drill;
  • diamond drilling rig.

How to break a wall in an apartment quickly and correctly

Regardless of the tool and method used to dismantle the wall, it is necessary to comply with a number of rules for carrying out the work:

  1. If there is a doorway in the wall being dismantled, it is necessary to remove the door from its hinges and then remove the door frame.
  2. Be sure to turn off the electricity in case there are wires running through the wall. Also remove sockets and switches from the wall, and insulate the ends of the wires on adjacent walls.
  3. Dismantle other types of communications that may also be hidden in the wall.
  4. If possible, remove the floor covering and lay down a flooring made of boards, which will soften the impact of falling pieces of the wall.
  5. Before breaking down the wall, you need to mark the wall into small pieces. All work on demolishing a wall must begin from the top!
  6. To remove debris and dismantled pieces of the wall, prepare in advance a sufficient number of construction bags, which are sold at any hardware store.

The neatest and least noisy way to remove a wall is to use an angle grinder. With its help, small pieces are cut into the wall according to pre-applied markings, which are then knocked out with a sledgehammer. For this type of work, the power of the tools and the diameter of the concrete circle that will be installed on the grinder are of great importance. A significant disadvantage of this method is the large amount of dust during operation. Therefore, if the renovation is not carried out in the entire apartment, it is advisable to abandon this method. There will be dust everywhere! The only way out is to use a construction vacuum cleaner.

The fastest way to break a wall is to use a jackhammer or a powerful hammer drill equipped with a special chisel. Disassembling the wall using this method will not be difficult for you. A significant disadvantage in this case will be the high cost of work and loud noise during operation. However, a home craftsman can get by with a lower-power hammer drill or impact drill. So before you break down a wall, think about it.

The work begins with the fact that it is necessary to drill through holes with a tool along the marking lines, spaced close to each other. Next, use a sledgehammer to carefully knock out a piece from the wall, avoiding it from falling to the floor if possible. This way you can disassemble the wall almost independently.

As you can see, you simply won’t be able to break a wall, especially one made of concrete, without dust and noise, so don’t forget to warn your neighbors. The best option in this case would be to involve specialists with professional equipment. Only the price of the question, how much it costs to break a wall, will depend on the material from which the wall is made and the amount of work to dismantle it. Below is a video on how to break a concrete wall

. It is possible that the information contained therein will help you during repairs.

Before proceeding directly to the demolition of the wall, you need to go through several authorities and obtain permission for redevelopment. The first thing you need to do is invite a specialist architect to advise you on which walls can be demolished and help you make a sketch. Already with a sketch made on the house plan, you can go to the BTI. If serious changes are underway, then a sketch is indispensable. Here you need to contact a construction organization to obtain a project for future redevelopment.

If the Housing Inspectorate responds positively, you can proceed with the work.

You must act strictly according to the presented project or sketch, since upon completion of the work, it will be necessary to call a commission from the Inspectorate to check and issue a certificate.

When permission is received, you can proceed to work. But before this, you need to take out and tightly cover with film and tape all the furniture and take care of built-in communications, such as electrical wiring and water pipes running in the wall for demolition.

The first step is to decide which tool will be used to perform the work. They are mostly done using one of these tools:

  1. Bulgarian;
  2. Powerful hammer drill;
  3. Jackhammer.

Whatever tool is chosen, work should begin by marking the wall. Because under no circumstances should you cut out the entire partition. This needs to be done in parts.

This method is acceptable only if no one is currently living in the apartment. This is due to the fact that when demolishing a concrete or brick partition with a jackhammer, a lot of dust is generated, which settles on all surfaces and penetrates through the smallest cracks.

To break a wall with a grinder, the tool must be equipped with a “concrete” disc. And then begin, according to the pre-applied markings, cutting off pieces of material. The advantage of using such a tool is the minimum noise and accuracy. The main disadvantage is a large amount of dust.

You can use a hammer drill to chisel, or you can cut it. Chiseling is a very effective method, but not the most accurate. In addition, using it in this way, you can accidentally hit something and destroy the excess.

Cutting off a concrete or brick partition with a hammer drill is the most suitable way to demolish a wall in a habitable apartment. Since this is the least dusty method. To cut a partition with a hammer drill, you need to drill through holes according to the markings, and then use a hammer and chisel to knock out the “cut out” parts.

Instructions for demolishing brick walls

Demolition of walls in an apartment begins with the preparation of tools; you may need:

  • pick;
  • chisel;
  • hammer;
  • perforator;
  • sledgehammer.

The wiring, if any, is dismantled. If it is no longer used, it is simply turned off to prevent a break or short circuit. All baseboards are removed, as are platbands. The plaster must be removed. A sledgehammer and a chisel will help deliver the first blows, which should be the most powerful. This will reduce the bond between the products, and the wall will become covered with cracks.

Dismantling will be easier if clay was used when laying the brick. Even if dismantling the walls also involves further replacement of the floor covering, you need to disassemble the partition in parts, preventing large pieces from falling onto the floor. This may cause damage to the floor.

How to dismantle concrete partitions

Before breaking down a wall in your apartment, you should think about what tools to use. To remove a concrete partition, it is best to use:

  • jackhammer;
  • hammer drill;
  • angle grinder.

This equipment will allow you to deal with the metal frame inside the structure. In this case, demolishing the wall completely is also impossible. You can use a hammer drill that is set to chiselling mode. But this approach is sloppy, and the work will be accompanied by a lot of noise.

In order to demolish a wall in an apartment, you can drill holes with a hammer drill or drill. The surface of the partition is first marked into sections. It will be possible to break the partition in the apartment when the holes are connected along the perimeter. Using a hammer and chisel, a separate section is squeezed out.

Demolition of a concrete partition

Dismantling wooden partitions

Work on demolishing a wall in an apartment will look slightly different if the partition is made of wood. The top layer of plaster is removed, the wiring must be de-energized or removed. You can break down walls using a hammer drill and a wide chisel. The work in this case goes quite quickly. Dismantling the wall at the next stage will involve cutting out individual sections of the structure.

Attention! Dismantling work is easiest to do if you use a reciprocating saw. Using a hand tool in the form of a nail puller or an ax will cause the process to take a long time.

Demolition of bathroom walls

Perhaps the most difficult stage of the redevelopment will be dismantling the wall between the bathroom and the toilet. Looking at the photos of modern bathrooms, you can understand that they look much more attractive if they are combined. At the first stage, you need to obtain approval for the redevelopment. If you intend to increase the area of ​​the premises at the expense of other rooms, permission must be obtained.

It will be necessary to draw up a project if you want to increase the number of plumbing fixtures or move them. Also prohibited is moving ventilation ducts and changing their shape. After looking at many photographs, you can understand what scheme to use to dismantle the partition in the apartment. To carry out the work you may need:

  • perforator;
  • Bulgarian;
  • chisel;
  • sledgehammer;
  • individual protection means;
  • nail puller;
  • chisel.

Demolition of house walls

Work algorithm

If the bathroom consists of plumbing cubicles, they can be demolished using certain rules. A pleasant bonus is that when such a partition is removed, additional space will appear, because in this case a gap is left between the rooms, which is usually filled with mineral wool. By the way, over time it becomes damp, begins to emit an unpleasant odor and becomes a home for insects.

Before removing the partition, you will need to remove the old decorative trim. Most often these are ceramic tiles. All plumbing fixtures are also on display. If you have to work with a plumbing cabin, you will need to dismantle not only the walls, but also the ceilings, as well as the base of the structure. More garbage will be generated here than if you dismantle a regular partition.

Often home craftsmen take photos during such work. Looking at them, you can understand that if you carry out such repairs yourself, you will have to work hard. Firstly, the process is quite labor-intensive. Secondly, it is accompanied by the formation of a large amount of garbage. To remove it you need to stock up on bags.

Breaking a wall in an apartment: cost

After the work is completed, you need to collect all construction waste in bags and remove it from the apartment.

If you don’t want to do all this yourself, then you can call specialists who will do this work, but this will not be cheap. The average price for the demolition of one square meter of concrete or brick partition is over 500 rubles. This figure may vary depending on the material from which the partition is made and its thickness. You will also have to pay additionally for the removal of construction waste.

When buying an apartment, we often encounter the fact that its layout does not suit us. The same situation arises when renovation of an old apartment begins. There are several ways to break . Each of them is technologically simple, but haste can lead to irreparable mistakes, so make sure you have some free time.

Overview of required tools

The set of tools depends on the base material that forms the basis of the supporting or enclosing structure.

To dismantle a partition, for example, in the kitchen, prepare the following devices and tools:

  • Pick. Useful if the finishing was done with ceramic tiles.
  • Hammer. Conducts preliminary preparation.
  • Sledgehammer. Required for dismantling.

Demolition of a wooden partition brings less difficulties and requires fewer tools. If the surface is not finished, then all work is done with a chainsaw.

If the base is concrete or brick, then you will need the following set:

  • Bulgarian;
  • perforator;
  • sledgehammer.

Main questions

  1. Which wall can be demolished? Any, except for carriers. can be determined by its thickness, which is significantly greater than that of other interior materials.
  2. Do I need permission to demolish a wall? Yes, permission is required to redevelop an apartment. In this case, you will have to collect a number of documents and visit the relevant institution. There have been cases when the owners of an apartment independently decided to demolish it and destroyed the load-bearing wall. As a result, the multi-storey building became warped, and living in it became dangerous. Imagine the responsibility that fell on the shoulders of these people. Be sure to get permission and call a builder to show you which walls you can touch.
  3. What is better to do: carry out the demolition yourself or order this service from specialists? Here you need to assess your financial capabilities and the time you are willing to spend. No special skills or knowledge are required on how to demolish a concrete wall. However, the cost of this service on the market is high. Therefore, it will be easier and more profitable for you to do everything yourself.
  4. Is it possible to get by with a sledgehammer and a pickaxe without using special tools? If you have a lot of time, you can get by with ordinary improvised means, but it is better to have a fairly powerful hammer drill and a grinder on hand.
  5. Is it possible to simply cut out a wall without breaking it piece by piece? The issue of dust worries many, because when you crumble concrete, there will be a lot of it. However, demolition of the entire wall is strictly prohibited. If you just cut out the wall, it will need to be removed somehow. It is impossible to do this entirely, and you will still have to break or cut it. But, most importantly, there is a risk that the huge concrete block that you cut out around the perimeter will collapse on the floor, destroying the room. It can also fall on you and your assistants, which is much worse. All this suggests that it is best to demolish the wall in parts, and each cut piece should be liftable and of such dimensions that it can be easily removed from the room.

The procedure for dismantling the partition

One of the most common types of work when remodeling premises is dismantling the partition between the bathroom and toilet. If the bathrooms are not made in the form of separate concrete cabins, the work will not be so difficult. But demolishing the walls will still be quite dusty and monotonous.

Brick walls are somewhat easier to break. To do this, you can remove the mortar from the seams to weaken the masonry, and then disassemble the structure in separate pieces and even blocks. This approach, by the way, allows you to save the material of brick walls for future use.

When the management company has received a positive answer to the question of whether the wall can be demolished, it is recommended to clear its surface of decorative trim and mark it into separate sections. Along the lines, it will be possible to disassemble the wall, starting from the top, so that too large pieces of heavy material do not damage the floors. If you have to dismantle the plasterboard wall between the room and the kitchen, you can preserve the integrity of the sheets for their subsequent installation for other purposes. The frame will remain almost unharmed, which is especially true for the metal profile.

How to break a septum

Technology for dismantling plasterboard sheets

Dismantling of plasterboard partitions is carried out using different tools:

  • Bulgarians;
  • screwdriver;
  • hacksaw for metal;
  • screwdriver;
  • spatulas;
  • drywall cutter;
  • nail puller;
  • crowbar;
  • mounts.

But only with the help of a screwdriver can you disassemble the walls without particularly damaging the sheets.

Attention! There is no need to find out from the relevant organization whether it is possible to demolish a room partition made of gypsum plasterboard. After all, such structures are lightweight and cannot be load-bearing.

If dismantling the partition does not involve the need to preserve the sheets, using a magnet it will be possible to detect the position of the metal profile. If you don’t have a magnet at hand, you can perform a simple calculation, taking into account that the width of plasterboard sheets is usually 120 cm. The step between the profiles of the frame structure is 60 cm. But the wall can also be reinforced, then the distance between the profiles is reduced to 40 cm .

When dismantling a partition is carried out with the need to preserve the sheets, on the surface of the dismantled wall it is necessary to find places for installing screws. The recesses from the caps are cleaned of putty, and then the fasteners are unscrewed with a screwdriver. Using this principle, you can also repair an old wall by replacing damaged sheets with a gypsum core with new ones.

Dismantling will be faster if there is no need to maintain the integrity of the finish. Then disassembly will involve cutting out individual pieces of material using a grinder. When the wall is cleared of outer layers, it will be possible to disassemble the frame. The elements are disconnected from each other by unscrewing the screws.

Dismantling of concrete partitions

Walls and partitions made of concrete are more difficult to dismantle than others. If you decide to free up additional space and remove the structure separating the kitchen and the room, you can use percussion instruments. A jackhammer or grinder will do the job perfectly. If it was decided to use a hammer drill, it must be powerful.

Every home craftsman has a grinder in his arsenal. It needs to be equipped with a special circle. The partition is disassembled in parts, starting from the top. If the dismantling plan involves the use of a jackhammer, then the room will require repairs after the wall is demolished. After this, there will be a huge amount of garbage and dust in the room.

If the partition is dismantled using a hammer drill, it will require equipment in the form of a chisel. Using this tool, the partition can be pierced through. You will need to make several holes. At the next stage, a piece of the wall is removed using a sledgehammer or jackhammer.

Dismantling a concrete partition

Dismantling partitions made of tongue-and-groove slabs

Dismantling work in the case of walls and partitions made of tongue-and-groove slabs will look almost the same as in the case described above. At the first stage, you need to use a grinder. Next, individual sections of the wall are knocked out with a sledgehammer or hammer drill. In order to remove heavy material from the room, it can first be crushed into smaller elements.

Dismantling of aerated concrete partitions

Dismantling brick partitions

Dismantling brick partitions may involve the use of one of several technologies. An excellent option is to use a sledgehammer. But in this case, it will not be possible to control the size of the dismantled pieces. You can also use the chiselling method using a hammer drill. This method of dismantling partitions is quite fast, but also extremely noisy.

Attention! When dismantling work is carried out by professionals, technical specifications are drawn up. These are standard technological maps that describe the entire work process. The TTC excludes force majeure circumstances in which a wall could collapse and, for example, damage the flooring or ceiling of a building.

Brick partitions can be disassembled by drilling holes with a drill. When a certain section of the wall has been identified along the perimeter in this way, it can be knocked out with a hammer. Dismantling of brick partitions is often carried out using the method of removing mortar from the seams. And also, since they are the weakest point of the structure, you can direct a blow there with a crowbar.

Dismantling glass partitions

Internal glass partitions in apartments and offices are usually dismantled while maintaining the filling. If this is a structure enclosed in a metal profile, it will be easier to operate than if the wall is built from glass blocks.

Glass walls are marked before dismantling so that they can be installed again afterwards. All unnecessary elements are removed from the walls, for example: lamps, shelves, switches. To release the glass, the profile fastenings are loosened. If the installation was carried out using self-tapping screws, they are unscrewed with a screwdriver.

Dismantling of office partitions

Before dismantling begins, furniture and equipment are removed from the office. Next, you need to loosen the fastenings, which is especially true when the structure is filled with acrylic or triplex. At the next stage, you need to dismantle the cables and wiring, disconnecting the communications from the sockets. The next step is to disassemble the profile. It is necessary to loosen the fastenings that are responsible for fixing the structure to the main walls, ceiling and floor. If necessary, all components of the partitions are packaged for further storage or transportation.

Frame demolition

In order to demolish the frame, it is necessary to remove the crossbars, if they are part of the system. The next step is to release the racks. At the final stage, you will need to remove the floor and ceiling trim.

If the frame is made of wood, then the work is carried out approximately according to the same principle. The only difference is in the disassembly technology. If the beams are connected by wooden tenons or steel studs, you will need to unscrew the threaded connection. With a tenon connection everything is somewhat more complicated. In this case, you will have to use a mount.

A wooden frame is not so easy to maintain while dismantling a wall. This is due to the fact that tenon joints usually deform the timber in individual places or along the entire length. But when quick dismantling is required and accuracy is a priority, you can use a saw or grinder.

Methods for demolishing walls

Let us dwell in detail on how to remove concrete. There are several ways to do this and you can choose whichever you like.

Sawing with a grinder

With a sufficiently powerful grinder and a supply of concrete discs, you can cut down the wall in pieces, removing one piece at a time. Decide for yourself in which direction you will start working. You can draw a cutting diagram directly on the wall.

There are two things worth saying about choosing an angle grinder. Firstly, it is desirable that it have as much power as possible. Secondly, it must support the ability to install large diameter disks. The width of the wall that you can eliminate depends on this parameter.

The advantages of this demolition method include low noise levels and minimal dust.

.

The disadvantages include the fact that the level of construction dust formation will still be considerable. After 5 minutes, visibility inside the room where work is taking place will sharply decrease. If you do not carefully close the rest of the rooms from dust, it will be everywhere: on all things and furniture, on the walls and ceiling. You will need glasses and a special mask to somehow breathe in such an environment. Be prepared for a thorough deep cleaning once the job is complete.

Powerful hammer drill

This is the easiest and fastest way

.
This is its main advantage, but the disadvantages include the maximum level of noise and dust formation
in comparison with other methods. In addition, in the hands of a non-professional, such a tool can cause more harm than good. If you aim poorly, you can break something unnecessary.

Impact drill or medium hammer drill

If you already have a fairly powerful impact drill or a regular hammer drill, you can carry out the redevelopment in the most comfortable way for yourself. The method is to use one of the above tools to drill holes in the wall. The easiest way to do this is along pre-drawn lines. The holes should be located next to each other.

When you have a kind of grid of holes, you can start knocking out pieces of concrete. To do this, take a hammer and chisel, or a sledgehammer if you don't want to make a lot of movements. With simple blows you will contribute to the formation of continuous gaps between the holes and soon you will be able to quite easily dismantle the entire wall.

What can you do

Along with prohibitions, there are also permitted works. With their help, owners can change the layout of apartments without the risk of damaging the structure of the house.

Move or demolish a partition

But this only applies to non-load-bearing partitions. On the technical plan they are indicated by ordinary lines (load-bearing walls - bold).

  1. Most often, the separator between the bathroom and the toilet is demolished - you get a combined bathroom.
  2. You can turn your apartment into a studio by demolishing the non-load-bearing wall between the room and the kitchen. At the same time, the kitchen should not be gasified. The gas supply valve must be closed.
  3. The construction of new partitions will make it possible to turn one room into two. For example, by creating a study or dressing room for storing things.

It is advisable to build partitions from lightweight materials, such as plasterboard. Heavy walls can put pressure on the floors. And not every partition will be allowed for you to create.

Expand the bathroom through the corridor

The corridor is an auxiliary non-residential premises. Due to it, it is quite possible to increase the area of ​​the bathroom and toilet. By the way, this is one of the most popular solutions for remodeling an apartment.

Important points:

  • Expansion of the bathroom due to the corridor space will require laying a waterproofing layer.
  • For such work, a redevelopment project is required, with the execution of hidden work certificates - they are signed by the drafter of the project, and then checked by an interdepartmental commission when the repair is completed.
  • The exit from the bathroom should lead into the corridor, and not into the living room or kitchen.

In general, a 99% increase in the bathroom due to the corridor is acceptable.

Move the kitchen to the hallway

It is also not against the law.

Instead of the room where the kitchen used to be, you can make another room, for example, a study. The newly created kitchen in the hallway should be at least 5 m² if you have a one-room apartment, and at least 8 m² if the number of rooms in the apartment is more than two.

On the ground floor, the kitchen can be moved anywhere - even to the hallway, even to the bedroom. On the middle floor, the kitchen can be moved to the corridor, provided that there is no neighbor’s bathroom above it. There should be no living quarters below. If your neighbors expanded the room at the expense of the corridor before you, moving the kitchen will not work.

Combine a room and kitchen with an electric stove

Kitchen-living rooms are popular. Visually, the space becomes larger, and it becomes possible to combine it with interior elements. All you need to do is remove the wall between the living room and the kitchen (if you have an electric stove).

Demolish the window sill block

An interesting option is to combine a balcony/loggia with a living room in an apartment. This cannot be done directly - due to legal prohibition. But you can make a partition between the balcony and the inner room. Usually they create a “French window” - glass swing doors.

To implement the idea, the window sill block will have to be completely dismantled. For example, in a brick and monolithic house this will not be a problem. But in a panel building, the dismantling of the window sill block is extremely difficult to coordinate.

Other permitted redevelopment works include sealing a doorway, replacing a gas stove with an electric one, creating mezzanines, dismantling them, merging adjacent apartments, etc.

Make an opening in a load-bearing wall

It is impossible to completely demolish a load-bearing wall, but you can make an opening in it.

The most difficult thing is to coordinate the opening in the load-bearing wall on the lower floors. For example, on the 1st floor the load on the structure reaches 80-90%. Any opening will weaken the cross-section of the load-bearing wall, which means the risk of the house collapsing will increase.

To create an opening, you need to order a redevelopment project and a technical report. The technical specifications are prepared by the author at home. In Moscow it is JSC MNIITEP. During the inspection, the specialist will ask for technical plans of the neighboring apartments - below and above. If their owners have already approved openings in their load-bearing walls, you will not be issued a permit.

Are you tired of reading? We’ll tell you over the phone and answer your questions.

Important points

  1. Remember that hidden electrical wiring can be fatal for you. There are special non-contact tools for detecting cables embedded in the wall. If you see a wire while knocking out a wall, under no circumstances use power tools near it. Remove the concrete around the wire using a hammer and chisel. Remember that there should be no pieces of concrete hanging on the wire. Any load can lead to its damage or rupture.
  2. Hidden reinforcement in reinforced concrete panels of multi-story buildings can be sawed using a grinder and a metal disc.
  3. Wall-mounted ones can also come as a surprise. Break the wall carefully, in small parts. If you come across pipes, they will likely need to be moved or removed. Ball valves on risers are used to shut off the flow of water.

That's all you need to know about concrete demolition. Stock up on tools and plenty of construction bags and get to work.

How to demolish walls made of different materials

Demolition of the wall begins from the top corner. It is prohibited to carry out demolition in the middle of the structure or from below. Failure to comply with this rule may result in injury during dismantling work. When demolishing a partition, it is worth considering what material it is built from. Certain features of dismantling work will depend on this.

Brick walls

Remove trim and baseboards. Thanks to such work, it is possible to observe the brickwork. Bricks are removed along the seams using a chisel and hammer. A sledgehammer and a jackhammer are often used for this. Regardless of the tool, dismantling the partition begins from the top corner.

Reinforced concrete walls

Partitions are demolished using a grinder, a jackhammer and a hammer drill. A spacer is installed between the floor and ceiling, which serves as a safety measure against the structure falling. The partition is broken down to a reinforced frame. It can be removed using a grinder. The partition is demolished in parts, which prevents the structure from falling and injuring workers.

Plasterboard partitions

They are the easiest to disassemble. You just need to remove the sheets of drywall and dismantle the frame.

plaster wall

Demolition is carried out as the dismantling of reinforced concrete structures. This partition contains reinforced wire. Its thickness is 6 mm. To break the structure, it is necessary to knock down the plaster to the wire, which is cut with a grinder. As a result, for demolition you will need a hammer drill, a hammer and a grinder.

With this information, you can quickly and efficiently demolish the wall between the kitchen and the room. The main thing is to remember safety. All work is carried out using gloves, a respirator and goggles.